SYS 01 · HVAC plants
Chillers, boilers, AHUs and RTUs: selected, set, and started.
We take plant equipment from submittal to startup: rigging plans, housekeeping pads, vibration isolation, combustion setup, and a documented commissioning handoff. Tenant improvement mechanical scopes run through the same desk, so the base building and the TI never fight each other.
- Equipment selection with the engineer of record
- Rigging, setting, and alignment
- Combustion and refrigerant startup
- TI mechanical scopes and as-builts
AHURTUChillerBoilerPumps